Pouring the pad for the Spa

Now that I have the hot tub I need to make a place for it. Next the house in the back yard is a nice place to place the spa. After talking to the concrete company they recommended that I have at least 5" of concrete. I Decided to have 6-7" with a base of 6-7" of gravel.
Vincent and I proceeded to hand dig a 9' x 9' square 12-14" deep. No problem took us about an hour and good news I had plenty of dirt for other projects.



Now that the hole was dug it is time for the fill of gravel. I borrowed a gas powered compactor and packed it down.
Vincent setting up the forms.
 Supervising
 Still Supervising while Vincent measures the depth.
Vincent ready for the concrete truck to arrive mud boots and all.
 Look at the nice pad Vincent poured he thought it was totally cool.
 Supervising
 Pad all poured and ready for the Tub.
 Next I will level and landscape around the pad.